Endua's power bank deployment at Archerfield Airport

Check out Endua’s power bank being transported from our Queensland engineering and manufacturing facility to be deployed at Archerfield Airport. This project demonstrates reliable, rapid deployment installing a hydrogen system, with minimal changes to existing infrastructure.

In this video

  • Preparing and transporting Endua’s containerised hydrogen power bank

  • Crane-assisted unloading and positioning at Archerfield Airport

  • Coordination between transport crews and Endua’s technical team during installation

Video description

Instrumental music accompanies footage of Endua’s PEM electrolyser technology and power bank equipment, the power bank being transported to Archerfield Airport, crane-assisted unloading and positioning on site. Endua team members and transport crews oversee its successful installation.

Explore the Archerfield Airport deployment

Read the full Archerfield Airport deployment case study for details on transport, installation, safety checks and ongoing monitoring. 

The project also received a wide range of press coverage, including: Airport demonstration to show hydrogen option will fly, Endua ticks off major milestones in hydrogen mission and Endua hydrogen technology unlocks clean energy. 

Learn more about the benefits of reliable, rapid deployment, Endua’s PEM electrolysis technology and Endua’s power bank for reliable multi-day clean energy storage.

If your organisation is exploring on-site hydrogen generation or long-duration energy storage, get in touch with our team about your site and energy requirements.

Next

Endua's on-site hydrogen deployment | PepsiCo Greenhouse Accelerator Program